Information on operation, adjustment, repairs and maintenance of Muldoon Positive Rear Steer System
 

 

1: Introduction Page 1
Driver Maintenance Information
2: Basic information Page 2 - Page 8
Repairs
3: The hydraulic system Page 9
4: Rams - remove and replacement Page 19
5: Bellcrank bolt remove and replace Page 21
6: Bellcrank centre bush - remove and replace Page 22
7: Cam follower Page 22
    A: Test Page 22
    B: Remove and refit Page 23
8: Rear turntable remove and replace Page 25
9: Front slew ring Page 25
    A: Test for wear Page 25
    B: Remove and replace Page 26
10: The wedge Page 26
11: Steering alignment Page 26
    A: Manual alignment Page 26
    B: Automatic alignment Page 27
    C: Rear bogey stoppers Page 27
    D: Adjustment stoppers after replacing bogey Page 29
    E: Rear Ram Adjustment Page 29
12: Parts list Page 30
    A: Complete Assembly (drawing) Page 31
    B: Compact Module - Standard Module (drawing) Page 32
    C: Hydraulic Rams Assembly - Piping Assembly (drawing) Page 33
    D: Back Bogey - Wedge Parts - Accumulator (drawing) Page 34


Next Page

Page 1

 

 

E-mail - info@muldoon.com

 

181 Clonmore Rd, Dungannon, Co. Tyrone, BT71 6HX, Tel: - 028 3885 2002/1873, Fax: - 028 3885 2203