Information on operation, adjustment, repairs and maintenance of Muldoon Positive Rear Steer System
 

Pages - 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34



FIG 10

Tighten this bolt (see FIG 11) while observing the pressure gauge.
Keep tightening until the pressure gauge reads zero. (see FIG 4c)
(Remember to release and remove the bolt after repairs are completed).


FIG 11

If it is desired to drain the oil from the accumulator, then proceed as follows.
First place a container under the valve manifold capable of holding at least 2 litres of oil. Then slacken the bleed screw at the top of the manifold, and press down on one side (see FIG 12).

Index | Previous Page | Next Page

Page 10

 

 

E-mail - info@muldoon.com

 

181 Clonmore Rd, Dungannon, Co. Tyrone, BT71 6HX, Tel: - 028 3885 2002/1873, Fax: - 028 3885 2203